assembly-lines

Buffing

A mid-line polishing booth. It was fun to see the thousands of lasers and other sensors that guided the robotic arms and tools around the bodies as they passed. Note the red/green stop/go lights in the distance.

End of the LIne-(C)SUSBTREET.org

End of the paint line. After reading Father Action’s excellent-as-always writeup about his adventures here, I was pretty cautious around big spinning alarms. (See http://www.actionsquad.org/fordII1.html)

Aerial Monorail

I like to think of this as the hardware abstraction layer. It’s one of many subassembly monorail conveyors that dipped onto the factory floor to deliver assembled subsections where they needed to be on the main assembly floor below.

Subassembly Line

These monorails were on a side line to build smaller parts of the Ranger before being attached to the truck itself. Note in the upper right that there’s another conveyor above this section.