control-rooms

Panel Overload

The control room was used through the mid-1990s as the plant was used to stabilize the power grid.

Hoist Operator Booth

Peering through the glass in the Hoist Operator’s cab, stained with graffiti. The cable and reels can be seen through the glass… these are now gone.

Hoist Room Panorama

On the left is the broken glass room that contains the controls for the cable spool, now gone, that sat in the metal shell on the right. The stairs led down to the hoisting engine itself. You can make out the slits where the cable ran up to the headframe tower through the gaping archway.

Sinterband 3

The control room for the whole of the plant. Sinterband here means one of the sintering lines. Temperatures, gasses, mixtures, speeds, and so on were centrally controlled here.

Gantry Crane Control

A long exposure in the crane cab at sunset throws a bit of color into the bleak yellow glows between the windows and car shaker.

Production

On this production line, the office was elevated far above the floor.

Hoist Controls

A burned and rusted control panel in the corner of the new hoist room.